Resumen
Nowadays, the New Product Development (NPD)
process demands shortest development cycle-time to
introduce the products into the global markets as well
as offer better products for the consumers, different
tools and methods are used to assure product launched
on time without failures. In this document will be
introduced a novel Failure Mode and Effect Analysis
(FMEA) used in combination, Analytic Hierarchical
Process (AHP) and Dimensional Analysis (DA),
changing the way to get the RPN over the FMEA
ranking process, getting an accurate FMEA-RPN-DA,
to help Engineers and project manager to handle their
project resources available in a wisely manner. This
paper contains an experimental case to validate the
proposed new method.